JSRACS Kindergarten is an Australian Interior Design Awards winning project. It is a teaching space built to sustainable principles utilizing bursts o…
Fiona Stanley Hospital is a 783 bed major tertiary and teaching hospital in Murdoch Western Australia. Completed in December 2013 it is the largest pr…
St John Bosco College is a Kindergarten for children under 12 years. The new state of the art early learning center includes primary classrooms, grass…
Aveling is a professional registered training organisation and one of the most respected training providers in WA to those in the mining,…
eliminated our use of landfill by installing the first recycling plant of its kind to convert pre-consumer waste into high performance ca…
By stopping up to 94% of walked in dirt and moisture Forbo Coral entrance flooring can greatly reduce cleaning costs and the risk for slipping.
Sustainable improvements do not stop at carbon neutrality. We are contributing to a circular world by closing the material loop for Marmoleum in every…
We include the whole life of a floor when we think about its sustainability performance. Which means we make sure our floors start performing from the…
Discover how Forbo Flooring’s 2030 environmental goals—from reducing emissions to circular flooring and zero-waste targets—support sustainable project…
A Forbo floor is always beautiful and stylish to look at. A floor that’s comfortable to live, work and play on. But looks aren’t everything; often, it…
At Forbo Flooring Systems, we are committed to transforming all our linear processes and products so they support the circular economy. Read more on h…
the vast majority of the countries in which Marmoleum Modular tile is sold are having a non landfill policy. Because of the high calorif…
a non landfill policy. Because of the high calorific value of Marmoleum Modular tile the incineration is very profitable as a waste to e…
of the product and the W W W W Wa a a a at t t t ter & soap er & soap er & soap er & soap er & soap W Wa at ter & soap er &…
would up to you wa 15 timnt esto i lon nc ger lude than that to your regular st floor icky purc feltsha se? Why would you want t…
landfill or incineration. Health, Safety and Environmental Aspects during Installation Forbo flooring recommends to use (low) zero emis…
and the environment: • Virtually zero landfill is achieved by the Coral manufacturing plant. • All the waste yarn from the Coral produc…
and the environment: • Virtually zero landfill is achieved by the Coral manufacturing plant. • All the waste yarn from the Coral produc…
about buildings and the environment: • Virtually zero landfill is achieved by the Coral manufacturing plant. • All the waste yarn from …
zero landfill is achieved by the Coral manufacturing plant. • All the waste yarn from the Coral production is re-used by the yarn supplie…
: Scenario 1: 100% Municipal Waste Incineration (MWI) with R1 > 60% Scenario 2: 100% landfill disposal D : Benefits and loads beyon…
, * Typical value; may vary based on batch and/ or rosin primarily from Indonesia. avoiding landfill or incineration gate fees. design •…
of an installation by preventing waste ranges are adhesive of our packaging free so can be recycled from going to landfill abandoned…
thickness 2.5 mm Product Weight 2 2.5 mm 2900 g/m 1 Rolls Width 2.00 Meter Length 60% 1 Scenario 2: 100% landfill disposal D …
. Each scenario is calculated as a 100% scenario: Scenario 1: 100% Municipal Waste Incineration (MWI) with R > 60% 1 Scenario 2: 100% land…
: Scenario 1: 100% Municipal Waste Incineration (MWI) with R > 60% 1 Scenario 2: 100% landfill disposal D : Benefits and loads beyo…
% scenario: Scenario 1: 100% Municipal Waste Incineration (MWI) with R > 60% 1 Scenario 2: 100% landfill disposal D : Benefits and…
) with R > 60% 1 Scenario 2: 100% landfill disposal D : Benefits and loads beyond the system boundary (Reuse, recovery, recycling pote…
Internal/External Titanium Dioxide plus Pigments X 60% 1 Scenario 2: 100% landfill disposal D : Benefits and loads beyond the sy…