The new Revius Lyceum was completed in the autumn of 2017. The new school obtains the energy label A +. There are about 600 solar panels on the roof of the school.
Floor coverings used in the school are; Marmoleum Concrete, Flotex Vision (Linear), Flotex Van Gogh, Allura luxury vinyl tiles and Bulletin Board pinboard linoleum.
Comissioned by | Revius Lyceum |
Building contractor | Burgland Bouw |
Flooring contractor | Ben de Graaff |
Architect | Spring Architects |
Photographer | Erik Poffers |
Location | Doorn, NL |