Vinci Construction's new head office is located in the P.A.C.A. region near Nice. More than 10,000 m2 of Forbo floor coverings have been installed in the new building.
For the office areas, Flotex acoustic flooring in planks format was applied. This acoustic option ensures a calm and pleasant working environment. Moreover, the modular plank format allows for beautiful creative floor designs.
In some areas of the office unique custom design have been applied. Sandy beach decorations were printed on our Flotex flooring in the French factory in Château-Renault.
In the kitchen area, Marmoleum flooring has been installed for its traffic resistance and environmental benefits. Its natural colour gives the room a warm, pleasant feel.
| Project name | Siège Social Vinci Construction |
| Building contractor | Vinci |
| Architect | Babel Architectes (76) |
| Location | Nice |
| Date of completion | 2024 |
| Photographer | Lisa Ricciotti |