SelectYourLanguage

Pulldown 2
Pulldown 2
Pulldown 2
Pulldown 2
Pulldown 2
Pulldown 2
Pulldown 2
Pulldown 2
Pulldown 2

eurocol
928 EUROPLAN WHITE

928

Gypsum-based self-levelling compound, very low-tension setting and up to 10 mm.

928_2017.jpg
  • safety data sheet_eurocol_928-white_uk.pdf

    safety data sheet_eurocol_928-white_uk.pdf

  • pdf-product-specification.pdf

    pdf-product-specification.pdf

Product Typification

TODO
Basis : Anhydrate-Alpha-halfhydrate.
Colour : White.
Consistency : Powder.

Product advantages:
  • Universal, curing with low tension, self-leveling levelling compound based on alpha hemihydrate.
  • For medium stress.
  • For levelling mineral subfloors, even less stable substrates, ceramic tiles, natural stone coverings, terrazzo, screwed wood-based panels (V100 P4 - P7, OSB 2 - 4) and
    prefabricated screeds.
  • Can be used in layer thicknesses up to 10 mm.
  • For following floor covering work.
  • Squeegeeable.
  • No ettringite formation on calcium sulphate screeds.
  • Chromate-free, therefore skin-friendly.
  • The product can be used on underfloor heating and is suitable for use with chair castors according to DIN EN 12529.
  • For indoor use.

Performances

Bureau Wheelchair resistance : From 2 mm layer thickness.
Classification : CE: DIN EN 13813: CA-C20-F7.
Consumption : Approx. 1.4 kg/m² per mm layer thickness.
Flammability : Non-flammable.
Frost resistance : yes.
Passableness : 2 - 3 hours at (18 - 20) °C.*
Special quality : Low tension, chromate-free.

Application

Application:
For producing even and absorbent surfaces for floor covering work.

Working Process

Layer thickness : Maximum 10 mm.
Tools : Trowel or notched squeegee in combination with a spiked roller, mixing-device.
Mixing ratio : Add 25 kg of 928 Europlan white to 5,5 - 6 litres of water.
Processing time : Use within 30 minutes after mixing.*
Storage : Store cool and dry.
Shelf Life : Approx 9 months, in unopened packaging.
Drying : Approx. 24 hrs. by 3 mm layer thickness, for each additional 3 mm - another day of drying time is required.
Cleaner : Water.
Frost-proof : yes.
Remarks : 

For layer thicknesses over 10 mm, on moisture-sensitive (e.g. calcium sulphate screeds) or unstable substrates, Eurocol reactive primers, e.g. 042 Euroblock Turbo or 021 Euroblock Reno LE should be used.

For layer thicknesses over 10 mm, on screwed wood-based panels, Eurocol reactive primers, e.g. 042 Euroblock Turbo or 021 Euroblock Reno LE should be used. 

Technical information and safety data sheets of other laying materials and floorings/parquet must be observed!

Apply flooring to the filled area within the next few days!
For absorbent subfloors keep a minimum layer thickness of 2 mm, for non-absorbent subfloors a minimum layer thickness of 3 mm. 

In case of multi-layer application, the layer thickness of the second application must not exceed the layer thickness of the first application.

After application of levelling compound.

  • Fresh surfaces should be protected against direct sun light, draughts, high temperature (above +30°C), rain and frost.
  • To obtain the recommended long term technical performance of product, after finishing levelling works installation of floor covering should be done within the shortest period of time, which depends on product’s drying time within 3 to 7 days, otherwise the surface should be protected with a suitable coating or covering.
The readiness for laying is dependent on the thickness of the layer and depends in particular on the climatic conditions on site.

Wear protective glasses and gloves.
If the adhesive or installation material comes into contact with your eyes, wash out immediately with plenty of water and consult an ophthalmologist.
Protect your hands with waterproof, robust gloves.
Wear long trousers.
Avoid prolonged skin contact with the adhesive or installation material. Thoroughly clean affected skin parts with water immediately.
The longer fresh adhesive or installation material remains on your skin, the greater the risk of serious skin damage.
Keep children away from fresh adhesive or installation material.

Not suitable for laying parquet.

* The mentioned values have been established in our laboratory and must be considered as guidelines in view of possible variations in climatic circumstances, subfloor compositions and layer thickness.

Consumption:
Approx. 1.4 kg/m² per mm layer thickness.

Substrate:
  • The substrate must be permanently dry, resistant to pressure and tension, free from cracks and dust, even and free from layers that reduce adhesion.
  • Adhesion-reducing layers, old material residues must be removed by suitable mechanical measures in accordance with the specifications of DIN 18365.
  • Old fixed floors, such as ceramic tiles, terrazzo, stone floors, are to be professionally cleaned with Eurocol 891 Euroclean Basic and sanded matt after drying. 
  • A primer coat of Eurocol adapted to the substrate and the expected layer thickness of the leveling compound is to be pre-coated. Allow the applied primer to dry thoroughly.
  • Cracks or joints (except structural expansion joints) must be closed with Eurocol Europlan 913 Silicate sealing compound.
  • Appropriately dimensioned Eurocol edge strips are to be used for rising building components.
  • Level out coarse unevenness in advance with stable filling compound. After complete drying, the surface must be primed again.
  • In the event of defects, objections must be reported in writing.


User manual:
  • Mix the powder in the specified quantity (see technical data) with clean, cold water using an electric mixer to form a smooth, lump-free mass. 
  • It is recommended to keep a maturing time of 2 - 3 minutes.
  • Avoid overwatering, as this leads to sedimentation and the formation of unstable surface layers. Drying is also delayed.
  • Apply the ready-mix within the working time in one working step if possible until the desired layer thickness is achieved.
    By using a squeegee and a spiked de-aeration roller, a smooth, even surface is obtained which usually does not need to be sanded.
  • During the setting of the levelling compound, draughts and intensive sunlight must be avoided.
    This can lead to a too fast withdrawal of moisture, which "burns" the filler layer, pulverizes the surface edge zone and shrinkage cracks can occur.
  • When laying on underfloor heating, the heating must be kept in operation for 3 days before, during and up to 7 days after laying with a surface temperature of 18 - 22°C.
  • In the case of multi-layer levelling, apply an intermediate coat of completely set first levelling compound before applying the second, alternatively use a levelling compound suitable for the required thickness of the layer to be applied, in order to level in one operation.
  • If sanding seems necessary, the sanded surface must be vacuumed and recoated with a dispersion primer suitable for the further application to bind residual dust.

Working conditions:
Required surrounding temperature: min. 18°C.
Material and subfloor temperature: min. 15°C.
Relative humidity: 35 - 75%, recommended <65%.

When mixing the product ensure that tools are always clean and free from cement residues.





Quality and guarantee

Environment and health

GISCODE : CP1 Calcium sulphate-based levelling compounds.
LEED : VOC 0 g/l, meets: IEQ Credit 4.1
DGNB : VOC 0 %, quality level: 4
Hazard Class : None.
Safety and environment : Safety data sheets of Forbo Eurocol products according to EEG-guideline 91/155. Wear protective gloves and safety glasses! Keep out of reach of children. Do not eat, drink or smoke while processing the product. Only give completely empty containers for recycling. Material residues can be disposed of as household waste.
MSDS : Available on request.


Articles

articelproductnamepackagingshipping unit
928Europlan Whitepaper bag à 25 kg42/pallet